(0) exportieren Drucken
Alle erweitern

Checklist: Staging a NAP Deployment

Betrifft: Windows Server 2008, Windows Server 2008 R2

This parent checklist includes cross-reference links to important concepts about staging your Network Access Protection (NAP) deployment. It also contains links to subordinate checklists that will help you complete the required tasks. Perform these tasks after you have completed lab testing of NAP.

noteHinweis
Complete the tasks in this checklist in order. When a reference link takes you to a conceptual topic or to a subordinate checklist, return to this topic after you review the conceptual topic or you complete the tasks in the subordinate checklist so that you can proceed with the remaining tasks in this checklist.

Prüfliste Checklist: Staging a NAP deployment

 

  Task Reference
Kontrollkästchen

Identify and prioritize goals; decide on enforcement types; define governance policy; identify pilot sites; document deployment decisions and processes.

Konzeptionsthema Identifying Your NAP Deployment Goals

Konzeptionsthema Choose an Enforcement Method

Konzeptionsthema Choose a Compliance Strategy

Konzeptionsthema Design an Exception Management Strategy

Konzeptionsthema Appendix C: Documenting Your NAP Design

Kontrollkästchen

Implement a NAP pilot deployment using reporting mode; start with a contained site or subnet and expand until you have fully deployed NAP at the pilot site.

Prüflistenthema Configure Network Policy for Reporting Mode

Kontrollkästchen

Configure your NAP pilot deployment for deferred enforcement mode; evaluate impact.

Prüflistenthema Configure Network Policy for Deferred Enforcement

Kontrollkästchen

Configure your NAP pilot deployment for full enforcement mode.

Prüflistenthema Configure Network Policy for Full Enforcement

Kontrollkästchen

Add more system health agents (SHAs); configure NAP to first report and then later enforce compliance for these new SHAs when compliance levels are high enough to meet your goals; reevaluate your compliance strategy as necessary.

Prüflistenthema Checklist: Deploy SHAs and SHVs

Kontrollkästchen

Add sites and scale out; implement load balancing and redundancy as needed; reevaluate goals and assess benefits.

Konzeptionsthema NAP Capacity Planning

Konzeptionsthema Benefits of NAP

Konzeptionsthema Identifying Your NAP Deployment Goals

Kontrollkästchen

Add new enforcement types as required by the architecture and design; repeat the staging process.

Konzeptionsthema Mapping Your Deployment Goals to a NAP Design

Fanden Sie dies hilfreich?
(1500 verbleibende Zeichen)
Vielen Dank für Ihr Feedback.

Community-Beiträge

HINZUFÜGEN
Microsoft führt eine Onlineumfrage durch, um Ihre Meinung zur MSDN-Website zu erfahren. Wenn Sie sich zur Teilnahme entscheiden, wird Ihnen die Onlineumfrage angezeigt, sobald Sie die MSDN-Website verlassen.

Möchten Sie an der Umfrage teilnehmen?
Anzeigen:
© 2014 Microsoft