September 2006 Documentation Update Notes
Topic Last Modified: 2006-09-05
The Exchange Server documentation team is pleased to announce the following additions and changes to our content.
The following topics are new:
-
Application Analysis Envisioning Process
-
Design and Deliver Proof of Concept
-
E-Mail Analysis Considerations
-
Prepare to Analyze
-
Vision Scope Document for Proof of Concept
-
Design and Deliver Proof of Concept
The following topics have had major updates (for example: procedures changed, support policies changed, best practices guidance changed):
-
Application Analysis Envisioning Process
-
Application Analyzer
-
Application Transporter Advanced Options
-
Buy vs. Build or Leave in Place
-
Classify Common Applications
-
Phase Four Deliverables
-
Phase One Considerations
-
Phase One: Collect Data
-
Phase Two Deliverables
-
Application Analyzer
-
Exchange Server 2003 Coexistence and Migration for Lotus Domino Mail
-
Calendar Connector Prerequisites
-
E-Mail Message Property Mapping
-
Mail Connector Configuration Considerations
-
Troubleshoot Calendar Connector
-
Troubleshoot Directory Synchronization
-
Calendar Connector Prerequisites
The following topics have had minor updates (for example: spelling errors corrected, URLs updated):
-
Exchange Server 2003 Coexistence and Migration for Lotus Domino Mail
-
Develop a Transition Plan
-
Troubleshooting Tools
-
Develop a Transition Plan
-
Microsoft Exchange Server Intelligent Message Filter v2 Operations Guide
-
Monitoring and Troubleshooting Exchange Server Intelligent Message Filter
-
Updating the Exchange Server Intelligent Message Filter
-
Monitoring and Troubleshooting Exchange Server Intelligent Message Filter
The following documentation downloads are new:
The following documentation downloads have been updated:
