Scale to a Load Balanced Enterprise Edition Pool Walkthrough

Communications Server 2007 R2

Topic Last Modified: 2012-02-01

Many enterprises begin their Office Communications Server deployment with a single Enterprise Edition Front End Server. As usage of the product becomes increasingly mission critical, it is common to move to a load-balanced configuration to provide high availability and increased capacity. This article describes the procedure for migrating from a single enterprise Front End Server to a load-balanced pool with more than one Front End Server.

Ee323526.note(en-us,office.13).gifNote:
This walkthrough assumes that the starting point is an enterprise edition Front End server without a load balancer. If the starting point is a Standard Edition server, similar steps may be followed. However, a new pool would need to be created and users migrated to this new pool as part of the cut over procedure.
Was this page helpful?
(1500 characters remaining)
Thank you for your feedback

Community Additions

ADD
Show:
© 2014 Microsoft