Refresh cycle (form)

Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012

Click Production control > Common > Lean manufacturing > Kanban board for process jobs. On the Action Pane, on the View tab, click Refresh cycle.

–or–

Click Production control > Common > Lean manufacturing > Kanban board for transfer jobs. On the Action Pane, on the View tab, click Refresh cycle.

–or–

Click Production control > Common > Lean manufacturing > Kanban schedule board. On the Action Pane, on the View tab, click Refresh cycle.

Use this form to configure the kanban board to automatically refresh the information that is displayed. By setting the kanban board to automatically refresh, you can use the kanban board as a visual display without the need for manual interaction.

Task that uses this form

Key tasks: Schedule kanban jobs for a work cell

The following table provides descriptions for the controls in this form.

Fields

Field

Description

Do not refresh automatically

Select this option if you do not want to configure the kanban board to automatically refresh.

Refresh automatically

Select this option to automatically refresh the kanban board. When this option is selected, the Cycle time (minimum 30 seconds) field becomes available.

Cycle time (minimum 30 seconds)

Enter a time interval to define how often the kanban board is automatically refreshed. The format is hh:mm:ss (hours:minutes:seconds). For example, a refresh cycle time of 00:15:00 means the kanban board is automatically refreshed every 15 minutes. The minimum refresh cycle time is 30 seconds.

See also

Kanban schedule board (form)

Kanban board for transfer jobs (form)

Kanban board for process jobs (form)

Announcements: To see known issues and recent fixes, use Issue search in Microsoft Dynamics Lifecycle Services (LCS).