(PM) Master plans (form)
Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2
Click Master planning > Setup > Plans > Master plans.
Use this form to create and maintain master plans. For each plan, you can set parameters that define how master scheduling is calculated for the plan.
You can work with several master plans to determine the consequences of various parameter setups. Set the default plan for master scheduling in the Master planning parameters form.
Task that uses this form
Set up sequencing parameters for a master plan
Navigating the form
The following tables provide descriptions for the controls in this form.
Note
The information is specific to Process manufacturing production and logistics.
For more information about the features and controls in this form, see:
Master plans (form)Tab
Tab |
Description |
---|---|
Sequencing |
Set up sequencing parameters that are used after the master scheduling calculation. |
Fields
Field |
Description |
---|---|
Sequencing |
Select this check box to set the sequencing time fence for the item during master scheduling. If you select this check box, enter the number of days that sequencing is performed. |
Sequencing active |
Select this check box to start the sequencing process when this master plan is used for regenerating replenishments. |
Bucket type |
Select one of the following options to indicate the sequencing campaign cycle:
|
Period type |
If you select Calendar in the Bucket type field, then select Day, Week, Month, or Quarter. If you select Period in the Bucket type field, the Day option is displayed by default. |
Sequencing bucket |
Enter the length of time specified in the Period type field. If the Day option is displayed in the Period type field, the number you enter in the Sequencing bucket field specifies the number of days in the sequencing campaign cycle. |
See also