September 2006 Documentation Update Notes
Última modificación del tema: 2006-09-05
The Exchange Server documentation team is pleased to announce the following additions and changes to our content.
New Content
The following topics are new:
- Application Analysis Envisioning Process
- Design and Deliver Proof of Concept
- E-Mail Analysis Considerations
- Prepare to Analyze
- Vision Scope Document for Proof of Concept
Content with Major Updates
The following topics have had major updates (for example: procedures changed, support policies changed, best practices guidance changed):
- Application Analysis Envisioning Process
- Application Analyzer
- Application Transporter Advanced Options
- Buy vs. Build or Leave in Place
- Classify Common Applications
- Phase Four Deliverables
- Phase One Considerations
- Phase One: Collect Data
- Phase Two Deliverables
- Exchange Server 2003 Coexistence and Migration for Lotus Domino Mail
- Calendar Connector Prerequisites
- E-Mail Message Property Mapping
- Mail Connector Configuration Considerations
- Troubleshoot Calendar Connector
- Troubleshoot Directory Synchronization
Content with Minor Updates
The following topics have had minor updates (for example: spelling errors corrected, URLs updated):
- Exchange Server 2003 Coexistence and Migration for Lotus Domino Mail
- Develop a Transition Plan
- Troubleshooting Tools
- Microsoft Exchange Server Intelligent Message Filter v2 Operations Guide
- Monitoring and Troubleshooting Exchange Server Intelligent Message Filter
- Updating the Exchange Server Intelligent Message Filter
New Downloadable Guides
The following documentation downloads are new:
Updated Downloadable Guides
The following documentation downloads have been updated: