About master scheduling - how the BOM version is determined

Important

This content is archived and is not being updated. For the latest documentation, see Microsoft Dynamics 365 product documentation. For the latest release plans, see Dynamics 365 and Microsoft Power Platform release plans.

Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012

During a demand explosion, if an item has a planned order type of production (in the coverage settings for an item), the planning engine finds a valid BOM version based on the site. The site is already known and is stated on the demand transaction. The following process is used to determine the BOM version to use:

  • If there is a BOM version defined for the item at the demand site, the site-specific BOM is used.

  • If there is no site-specific BOM version defined for an item at the demand site, a general BOM is used. A general BOM does not state a site, and it is valid for multiple sites. If there is a general BOM, it is used.

  • If there is no general BOM version to use, the demand explosion stops at this point.

A valid BOM version, whether site-specific or general, must meet the required criteria for date and quantity.

See also

Master planning and multisite functionality

About master scheduling - how the BOM version is determined

About master scheduling - site and warehouse coverage, warehouse mandatory

About master scheduling - site coverage, warehouse mandatory

About master scheduling - site coverage, warehouse not mandatory

About master scheduling - site and warehouse coverage, warehouse not mandatory