Lean manufacturing next version parameters (form)

Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012

Click Preprocessing upgrade checklist > Prepare application data for preprocessing. Click Prepare kanbans for migration or Prepare LOS schedules for migration. Click Next version base data, and then click Parameters.

Use this form to define default parameters that are used in Microsoft Dynamics AX 2012 Lean manufacturing.

The following tables provide descriptions for the controls in this form.

Tabs

Tab

Description

Lean manufacturing

Define default parameters that are used when production flows and activities are created.

Number sequences

Define the setup for number sequences that are used in Lean manufacturing.

Fields

Fields

Description

Default time unit

Select a default unit of measure to use to measure time when production flows and activities are created.

Default quantity unit

Select a default unit of measure to use to measure quantity when production flows and activities are created.

Time units

Define units of measure to use as time units in production flow activities. The time units are as follows:

  • Days

  • Hours

  • Minutes

  • Seconds

Number sequence code

Select the number sequence codes to use when Lean manufacturing transactions are created.

See also

About Lean manufacturing migration

Convert kanbans to next version kanban rules (form)

Convert LOS-BTO schedules to next version kanban rules (form)

Announcements: To see known issues and recent fixes, use Issue search in Microsoft Dynamics Lifecycle Services (LCS).