Synchronize the job table [AX 2012]

Updated: July 22, 2011

Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012

Workers can make registrations on various kinds of jobs in Time and attendance:

  • Production orders

  • Projects and project activities

  • Absence registrations

  • Indirect activities

All jobs to be used for registration are maintained in the Time and attendance job table. This job table must be synchronized with the tables that contain the original jobs, for example, production jobs, or project activities.

In Production control > Setup > Time and attendance > Parameters, in the General section, select Online in the Job table synchronization mode field.

Refer to the Initial synchronization section at the end of this topic to make an initial synchronization. After the initial synchronization, the job table will be updated by the system every time a new job is created.

In Production control > Setup > Time and attendance > Parameters, in the General section, select Offline in the Job table synchronization mode field.

Refer to the following section to make an initial synchronization. Click Human resources > Periodic > Time and attendance > Update > Synchronize job table. This approach allows you to define how frequently the job table should be updated.

TipTip

This type of synchronization provides optimal performance.

The initial synchronization will update the job table.

  1. Click Human resources > Periodic > Time and attendance > Update > Synchronize job table.

  2. Select the types of jobs on which to perform the synchronization.

  3. If you have selected to run Offline synchronization, as described in the Offline section of this topic, select the parameters to be used for the batch job.