Event ID 129 — Task Monitoring and Control

Applies To: Windows Server 2008 R2

The history of a task is tracked by events. These events can be viewed in Task Scheduler for each task to track when the task was registered, run, and when it completed or failed. The progress of a task can be monitored through its history. A task can be controlled by running or stopping the task manually (on-demand).

Event Details

Product: Windows Operating System
ID: 129
Source: Microsoft-Windows-TaskScheduler
Version: 6.1
Symbolic Name: CREATED_TASK_PROCESS
Message: Task Scheduler launched the "%2" instance of the "%1" task with process ID %3.

Resolve

This is a normal condition. No further action is required.

Task Monitoring and Control

Management Infrastructure