Controlling Connector Forwarding

Applies To: Operations Manager 2007 R2, Operations Manager 2007 SP1

This section includes information about controlling the sending and receiving activity of Microsoft System Center Operations Manager 2007 R2 Connectors.

Interop Connector Flow Control

The following procedure provides information for manually forwarding individual alerts or groups of Operations Manager 2007 R2 alerts. Use an Operations Manager 2007 R2 Product Connector subscription to configure automatic forwarding of Operations Manager 2007 R2 alerts.

To manually forward an Operations Manager 2007 alert

  1. With an alert in the Results Pane of the Operations Manager 2007 R2 Operations console, right-click the alert, click Forward to, and then click the specific Connector you want to use.

    Note

    Multiple alerts can be selected for forwarding by using the usual methods of selecting multiple items. Use the Shift key for sequential selection or the Ctrl key for out-of-sequence selection.

  2. The forwarding status of the alert that is being forwarded briefly turns to Forwarding Pending and then to Successfully Forwarded. In Operations Manager 2007 R2 the remote system event ID is stored in the Operations Manager 2007 R2 TicketID field after a successful forwarding.