About order-specific BOM calculations [AX 2012]

Updated: June 21, 2011

Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012

An order-specific bill of materials (BOM) calculation represents a variation of a BOM calculation for a manufactured item. An order-specific BOM calculation is performed in the context of a sales order, sales quotation, or service order line item. An order-specific BOM calculation generates a calculation record that is displayed in the BOM calculation results form. The calculation record includes a calculated weight, a calculated cost that is based on active cost records, and a calculated sales price. Each order-specific BOM calculation for an item generates a calculation record in the BOM calculation results form, uniquely identified by a calculation number. The results of a calculation record can optionally be transferred to the originating line item.

An order-specific BOM calculation differs from a BOM calculation for a manufactured item. First, an order-specific BOM calculation does not generate an item cost record throughout a costing version. This results in the BOM calculation policies not applying to create an item cost record or to overwrite a cost record. Second, an order-specific BOM calculation always uses the active cost records for components, cost categories, and indirect cost calculation formulas.


Announcements: To see known issues and recent fixes, use Issue search in Microsoft Dynamics Lifecycle Services (LCS).

Community Additions

ADD
Show: