Recalculate takt times (class form) [AX 2012]

Updated: September 26, 2012

Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012

Click Production control > Setup > Lean manufacturing > Production flows. On the Versions tab, click Recalculate.

Use this form to recalculate the activity cycle times of a production flow version. This function is useful if a version is changed after it is validated. Changes to a version that affect activity cycle times include the following:

  • Average takt time time

  • Minimum takt time

  • Maximum takt time

  • Per cycle unit of measure

  • Quantity per cycle

You can set up synchronous processing or batch group processing. Validation warnings and error messages are displayed in an Infolog.

The following links provide descriptions for the controls in this form.

Enter criteria on the General tab

Submit a batch processing job from a form