(PM) Futures messages (form)

Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012

Click Master planning > Reports > Coverage > Futures.

Use this form to view all item requirements that carry a futures message. The futures messages were calculated during the last master scheduling.

For additional information on futures messages, see About futures messages.

The following tables provide descriptions for the controls in this form.

Note

The information is specific to Process manufacturing production and logistics.

For more information about the features and controls in this form, see:

 Futures messages details (form)

Fields

Field

Description

CW requested qty

The requested quantity, in the catch weight unit, that is referenced by the transaction.

CW req. qty

The total requirement quantity, in the catch weight unit, that is referenced by the transaction.

CW coverage planned

The catch weight quantity that is currently coverage-planned for the transfer.

Announcements: To see known issues and recent fixes, use Issue search in Microsoft Dynamics Lifecycle Services (LCS).