Route versions (form)
Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012
Click Production control > Common > Routes > All routes. On the Action Pane, click Route versions.
Use this form to view all existing versions of the selected route. You can create new routes, approve existing routes, make route versions active, and define their valid dates.
Task that uses this form
Navigating the form
The following tables provide descriptions for the controls in this form.
Buttons
Button |
Description |
|
---|---|---|
Create route |
Open the Route form, where you can view or change information about the operations in the selected route. |
|
Create route |
Create a new route. You can also copy an existing route and use it as the starting point for creating the new route. |
|
Approve |
Open the Approved by form, where you can approve the route. You must select the worker who approved the route. |
|
Activation |
Activate the route version for the selected bill of materials (BOM) version. |
|
Route feasibility |
Verify that the operations resources can satisfy all resource requirements for all operations on a selected date. |
Fields
Field |
Description |
---|---|
Route number |
The route number for the selected route. |
Name |
The name of the selected route. |
Item group |
The item group that is assigned to the route. |
Approved by |
The person who approved the current route version. To open the Approve version form, click the Approve button on the Versions FastTab. |
Approved |
A selected check box indicates that the selected route version is approved. A route version must be approved before being activated and used. |
Configuration |
The configuration assigned to the selected item. |
Size |
The size dimension for the item. |
Color |
The color dimension for the item. |
Site |
The site where the production occurs. |
From date |
Select the date when the route version becomes valid. This date is used to manage multiple route versions. |
To date |
Select the last date that the route version is valid. |
From qty. |
Enter the minimum quantity that is valid for this route version. When generating orders, the system selects a route version based on this value and other criteria that you specify. If you leave the field blank, this route version is valid for all quantities. Note that route scrap is not considered when a route version is selected. |
Active |
A selected check box indicates that the route version is active. |