Cycle time history (form)
Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012
Click Production control > Setup > Lean manufacturing > Production flows. Click Cycle time history.
Use this form to obtain an overview of the past cycle times that are recorded for the selected production flow version. The cycle times are grouped by periods. These periods depend on the Period template that you select.
Navigating the form
The following table provides descriptions for the controls in this form.
Fields
Fields |
Description |
---|---|
Period template |
Select the period template to use. The performance time that is required to display the data depends on the number and length of the periods in the period template. |
From date |
The start date of the period. |
To date |
The end date of the period. |
Total time |
The total amount of working time in the period, expressed in minutes. |
Total quantity |
The total quantity of product that was produced by the production flow version during the period. |
Average cycle time |
The average cycle time that is targeted for the production flow version. |
Actual cycle time |
The actual cycle time that is calculated based on the jobs completed during the periods. |
Deviation |
The deviation between the targeted Average cycle time and the calculated Actual cycle time. |
Cycle time unit |
The time unit that is set up to define takt times and cycle times for the production flow version. |
Version |
The production flow version that was active during the period. |
See also
Production flow version details (form)
Recalculate takt times (class form)