Gantt chart setup (form)
Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012
Click Organization administration > Common > Resources > Gantt charts. Click GanttSetup > Setup.
Use this form to enter settings that determine what information to display in the Gantt chart and how to display the information.
Navigating the form
The following tables provide descriptions for the controls in this form.
Tabs
Tab |
Description |
---|---|
General |
Define the general settings for the Gantt chart. |
Production |
Define the settings for production orders. |
Planned production |
Define the settings for planned production orders. |
Project |
Define the settings for project activities. |
Buttons
Button |
Description |
---|---|
Apply |
Apply changes without closing the form. |
Fields
Field |
Description |
---|---|
Load calendar |
Select this check box to use the calendar that is defined for the operations resource. Note You can reschedule a job in a chart by using the drag-and-drop method only when the calendar is loaded. |
Non work interval |
Select this check box to display the nonworking time interval as a thin line instead of a full bar. If the check box is cleared, the working times and nonworking times are displayed as a full bar. |
Show world view |
Select this check box to enable the Fixed at top, Fixed at bottom, and Popup window fields. These fields enable you to set the position of a Gantt chart in the form. |
Show all links |
Select this check box to display all of the links between jobs in the chart. If the check box is cleared, only the links for the selected orders are displayed. |
Show late jobs |
Select this check box to display jobs that have an expected finish date and time that are later than the job's delivery date and time. |
Load production data |
Select this check box to display production order data in a chart. |
Show job types |
Select the check boxes for the job types that you want to display in a chart. Note Only the selected job types are loaded in a chart. Job types that are not selected are not included in manual rescheduling, and rescheduling may not pass validation. |
Show jobs |
Select the check boxes for the jobs that you want to display in a chart. |
Load entire order |
When you select this check box, a Gantt chart loads all of the data that is related to the order. This may cause the timescale interval to exceed the originally defined ending date. Note This check box is available when you use an operations resource Gantt chart or a Gantt table Gantt chart. |
Completion |
Select this check box to display a completion bar for the operation in the chart. A completion bar displays the progress of an operation, based on reported times compared to standard times. Because over-consumption and under-consumption can affect standard times, the completion bar is displayed as follows:
|
Load planned production data |
Select this check box to display planned production order data in the chart. By default, this check box is selected when you open a Gantt chart from the Planned orders form. |
Load project data |
Select this check box to display project activities in the chart. |