Status report

Applies To: System Center 2012 R2 Data Protection Manager, System Center 2012 SP1 - Data Protection Manager, System Center Data Protection Manager 2010

The Status Report provides the status of all recovery points for a specified period, lists recovery jobs, and shows the total number of successes and failures for recovery points and disk-based and tape-based recovery point creations. This report shows trends in the frequency of errors that occur and lists the number of alerts.

Frequently Asked Questions

While you are reviewing the data in the Status Report, you might have the following questions about how to use the data or interpret the report.

Why is the trend of recovery point job failures rising?

This can be caused by a variety of issues. You can review the details for a recovery point job failure in the Monitoring task area and determine the resolution. For more information, see How to Display Job Details.

Why is the protection objective not being met?

A recovery point is created only if the corresponding synchronization job, since the last recovery point job, was run successfully. If the corresponding synchronization job failed, the scheduled recovery point will not be created.

See Also

Tasks

Print reports

Concepts

Report Types
Work with recovery points

Other Resources

Set up DPM reporting

-----
For additional resources, see Information and Support for System Center 2012.

Tip: Use this query to find online documentation in the TechNet Library for System Center 2012. For instructions and examples, see Search the System Center 2012 Documentation Library.
-----