How to Change a DTS Job Schedule

You can temporarily prevent jobs from running to keep their load from affecting an SMS or MOM database. Temporarily preventing jobs from running allows free access to the database by other processes. For example, if SMS Inbox files are backlogged on the SMS server, an additional SCRM DTS job would add an additional load on the SMS site database.

To change the schedule of a DTS job

  1. Open the SCRM Administrator console.

  2. Click Data Warehouse, and then click Jobs.

  3. Right-click the job for which you want to change the schedule, and then click Properties.

  4. Click the Schedule tab.

  5. Change the schedule of the job to the desired time.